Global Wire Mesh
2018-01-15
2012-08-02
weld wire mesh-Flood Line
Flood Line
Information
|
2012-07-18
钢格板围墙-Chain link fence
Chain link fence,fence-Chain link fence, also known by some as cyclone fence,hesco bastion, is one of the most popular choices of fence for both light residential to heavy commercial fence applications. Chain link fence is one of the most practical styles of fence,Window Screening-Perforated metal, relatively easy to install, and very cost effective.
Material: Low carbon steel wire, stainless steel wire,钢筋焊接网, aluminum alloy wire.
Weaving: Woven diamond pattern provides strong,砖带电焊网,锯齿钢格板-Razor Barbed Wire mesh, durable and flexible construction. The closely spaced diamond mesh construction gives your fence linear strength and springy texture to protect horses from injury and prevent predators from entering paddocks and pastures.
Tel: 086-3118-7733-505
Fax: 086-3118-7733-508
E-mail: info@theqiaoshi.com
2011-12-24
Flood prevention the easy way-metal wire mesh
Flood prevention the easy way,Tie Wire
Published: 1/12/2011 at 11:09 AM
Online news: Easier Stuff
A group of Thai technical experts are suggesting a relatively quick and painless way to prevent major floods in the future: a long tunnel.
Please join us on our facebook page: http://www.facebook.com/bangkokpostlearning
Click button to listen to Flood tunnel and rightclick to download
Flood prevention the easy way
Water flows from high areas to low. In the case of a major flood,浪型网, this process can be slow and massively destructive or,cattle fence, according a group of Thai technical experts, it can be quick and relatively painless.
The Thailand Underground and Tunnelling Group has suggested the government invest around 200 billion baht to build a 100km-long tunnel under the eastern section of the outer ring road to prevent future flooding in and around the capital.
Suchatvee Suwansawat, TUTG chairman, yesterday said the proposed tunnel should be built from Bang Pa-in in Ayutthaya to Samut Prakan province where the water would empty into the Gulf of Thailand. It could be completed in two years.
The tunnel would be designed as a double-deck underground structure, called a multi-service flood tunnel system, and would also be equipped with hydropower generators for power production,black wire mesh, Assoc Prof Suchatvee said.
The upper deck would be used as a road under normal conditions when there were no floods or during minor and moderate flooding.
The lower deck would be used as a flood drain during normal situations.
During major floods,gabions, the upper deck would be closed to traffic and turned into a floodway to help speed up drainage of run-off.
Assoc Prof Suchatvee said a similar system should also be considered for the western part of Bangkok.
Large tunnels would be practical, more effective and thus the best solution to prevent major flooding over the long run.
Prasong Tarachai, former president of the Engineering Institute of Thailand said the underground flood prevention tunnel system should be built from Nakhon Sawan.
He also suggested integrating 20 state agencies involved in the water management system and creating a more accurate water information system.
"City planning should be revised to include floodways," he said.
Adapted from a story in todays Bangkok Post by Kanana Katharangsiporn.
prevention preventing something bad from happening การป้องกันภ้ย
flow (of a liquid) to move continuously in one direction ไหล
process a series of things that happen,Govt urged to build B200bn flood tunnel-Expanded Mesh Machine, especially ones that result in natural changes ขบวนการ,Concerns, floodwaters rise in Bangkok-Expanded Metal Mesh, ,การเปลี่ยนแปลง
massive very large ใหญ่มหาศาล
destructive causing great damage or harm ซึ่งเป็นการทำลาย
expert someone who has a particular skill or who knows a lot about a particular subject ผู้เชี่ยวชาญ
relatively somewhat; in comparison with someone or something similar ค่อนข้าง
tunnel an underground passage อุโมงค์
section any of the parts into which something is divided ส่วน, ส่วนที่ตัดออก,wire, ส่วนย่อย
ring road a road that goes around a large town or city,Eastern area dry next week-不锈钢生丝,镀铜网, for keeping traffic away from the town centre ถนนวงแหวนรอบนอก
capital the most important town or city of a country, usually where the central government operates from เมืองหลวง
proposed suggested as an idea for a group to consider ถูกเสนอ
empty to flow or move out from one place to another ปล่อยน้ำทิ้ง
double-deck having two levels, one on top of the other สองชั้น
multi- more than one; many มาก, หลาย
hydropower power generated by running water
generator a machine that produces electricity เครื่องกำเนิดไฟฟ้า
normal typical, usual or ordinary; what you would expect ภาวะปกติ
conditions the circumstances or situation in which people live,石笼网,Bangkok flooding passes critical point PM-Wire Mesh Fence, work or do things เหตุการณ์,石筐, สภาพการ, สถานการณ์
minor not important; small; having little influence or effect เล็กน้อย
moderate neither very great nor very small in strength, size,Gabion Gravity Retaining Walls, amount or degree ระดับปานกลาง
drain to cause water or fluid to flow out ระบายออก
situation all the circumstances and things that are happening at a particular time and in a particular place สถานการณ์
consider to give careful thought to something before making a decision พิจารณา
practical - suitable for the situation in which something is used ที่ขึ้นอยู่กับความเป็นจริง
effective producing the result that was intended ได้ผลดี
solution a way of solving a problem or dealing with a difficult situation วิธีแก้ปัญหา
the long run over a long period or time, rather than a short period ในระยะยาว
integrate to combine things of different types in one effective system รวมเข้าด้วยกัน
state government รัฐบาล
accurate correct, exact and without any mistakes ถูกต้อง,Thailand's Thongchai in floods appeal-hesco bastion, แม่นยำ
revise to change, improve, or make additions to something แก้ไข
Military Barriers/Hesco Bastions
Information
The QIAOSHI's Military Barriers or Hesco Bastions is a modern gabion used for flood control and military fortification. It is made of a collapsible wire mesh container and heavy duty fabric liner, and used as a temporary to semi-permanent dike or barrier against blast or small-arms. One of the less heralded life- and labor-saving devices of war, it is used on nearly every United States Military base in Iraq as well as on NATO bases in Afghanistan.
Originally designed for use on beaches and marshes for erosion and flood control, the Hesco Bastion quickly became a popular security device in the 1990s.
Assembly
Assembling the Hesco Bastion entails unfolding it and (if available) using a front end loader to fill it with sand, dirt or gravel. The placement of the barrier is generally very similar to the placement of a sandbag barrier or earth berm except that room must generally be allowed for the equipment used to fill the barrier. The main advantage of Military Barrier, strongly contributing to their popularity with troops and flood fighters,Expanded Metal Meshes, is the quick and easy setup. Previously, people had to fill sandbags,sheep fence, a slow undertaking, with one worker filling about 20 sandbags per hour. Workers using Military Barrier and a front end loader can do ten times the work of those using sandbags.
The Hesco Barrier come in a variety of sizes. Most of the barriers can also be stacked, and they are shipped collapsed in compact sets. Example dimensions of typical configurations are 46" x 36" x 32 (1.4m x 1.1m x 9.8m) to 7 x 5 x 100 (2.1m x 1.5m x 30m).
A new system of Hesco Bastion developed specially for military use is deployed from a container, which is dragged along the line of ground where the barrier is to be formed, unfolding up to several hundred meters of barrier in minutes, ready for filling with soil by a backhoe.
Protection
Filled with sand, 60 centimetres (24 inches) of barrier thickness will stop rifle bullets and shell fragments. It takes 1.5 metres (five feet) of thickness to prevent penetration by a rocket propelled grenade round. Approximately 1.2 metres (four feet) of thickness provides protection against most car bombs.
Specification
2011-12-10
Floods Factories reopening-stainless steel back
Floods Factories reopening
- Published: 2/12/2011 at 02:03 PM
- Online news: Learning From News
The QIAOSHI's Military Barriers or Hesco Bastions is a modern gabion used for flood control and military fortification. It is made of a collapsible wire mesh container and heavy duty fabric liner, and used as a temporary to semi-permanent dike or barrier against blast or small-arms. One of the less heralded life- and labor-saving devices of war, it is used on nearly every United States Military base in Iraq as well as on NATO bases in Afghanistan.
Military Barriers/Hesco Bastions
Information
Specification
INDUSTRIAL ESTATES: Hi-Tech partially reopens early, Massive utility hike to pay for new dyke by Nareerat Wiriyapong
AYUTTHAYA : Flood-ravaged Hi-Tech Industrial Park resumed operations yesterday, 15 days ahead of target, while 30 factories there have already laid off over 8,700 staff.
Thavich Taychanavakul, Hi-Tech's managing director, said the 20-year-old estate projected it would reopen on Dec 15 after it was hit by floods on Oct 13.
About 10 of 140 factories in the estate are ready to restart production, including Aapico Hitech and Canon Hitech.
Hi-Tech is the third estate in Ayutthaya to resume operations after Factoryland and Bangpa-in Industrial Estate.
Five estates in the province are inundated: Hi-Tech,Y Post, Factoryland, Bangpa-in, Rojana, and Saha Rattana Nakorn.
There are 60,stainless steel back,000 workers employed at Hi-Tech with direct investment of 60 billion baht.
Wannarat Srisuksai, Ayutthaya's Labour Protection and Welfare official, said the number of factories cutting headcounts has more than doubled from 12 last month to 30.
There are 5,364 factories in Ayutthaya employing 380,000 people.
Monta Pranootnarapal, the Industrial Estate Authority of Thailand's governor, said floodwater would start to be pumped out of Saha Rattana Nakorn Industrial Estate on Dec 3 and take two days to finish.
The other two flooded estates were in Pathum Thani: Nava Nakorn and Bangkadi.
Mr Thavich said roughly 100 million baht is required to restore utilities at Hi-Tech, with 330 million slated for building 11 kilometres of a new dyke around the estate with a height of 5.40 metres. The existing dyke is 4.20 metres high, but the flood reached 4.9 metres above sea level at its peak
He said the company plans to increase the central utility fee by 1,200-1,500 baht per rai per month on top of 900-1,000 baht per rai at present. The hike is aimed at mobilising money to repay loans for building the dyke.
The increased fee, which is subject to approval from IEAT, will be applied for 15 years, he said.
Ms Monta agreed the fee was needed to build new infrastructure.
All five submerged estates in Ayutthaya should reopen in January.
Mr Thavich said 3% of the existing 140 companies are expected to relocate from Hi-Tech partly to leverage risks.
"Some companies heavily relied on manufacturing in Thailand. Now they are looking at other locations to minimise risks of a disruption in the future," he said.
(Source: Bangkok Post, INDUSTRIAL ESTATES,H.M. King Bhumibol Provides Relief Packages to Flood Victims-HESCO, Hi-Tech partially reopens early, Massive utility hike to pay for new dyke,Appeal launched for flood pics-hesco bastion, 2/12/2011, Nareerat Wiriyapong, link)
Flood Recovery Vocabulary
industrial estate - a special areas for factories that has special infrastructure such as electricity and water supply, transportation such as ports and railway, etc , also called "industrial park" (See Wikipedia)
duty - something that you have to do because it is part of your job หน้าที่, ความรับผิดชอบ
report for duty - go to your workplace to start work
partially - partly; not completely
partially reopens
utility - some basic service like electricity or water (usually provided by the government or a large monopoly) (See Wikipedia)
utility hike - increase in price of services such as electricity and water
dyke - a water wall; a wall built to prevent the sea or a river from covering an area, or a channel dug to take water away from an area เขื่อนกั้นน้ำ
utility hike to pay for new dyke
fee - an amount of money that you pay to be allowed to do something ค่าธรรมเนียม, ค่าตอบแทน, ค่าบริการ
utility fee - the amount of money paid each month for services such as electricity and water
plans to increase the central utility fee by 1,200-1,500 baht per rai per month on top of 900-1,000 baht per rai at present.
restore - to cause a particular situation to exist again, especially a good one ฟื้นฟูสภาพ
restore utilities - can use electricity and water again (after service stopped for a period of time)
ravaged - destroyed
flood-ravaged - destroyed by floods
resume - start again after stopping (ธุรกิจ) ที่ฟื้นตัวอีกครั้ง ดำเนินต่อไปใหม่, กลับมาอีกครั้ง
resumed operations - when a company starts doing business again after stopping for a period of time
target - a goal; the amount you are planning to achieve เป้าหมาย
ahead of target - reached their goals before deadline (the date they planned to reach goals)
flood-ravaged Hi-Tech Industrial Park resumed operations yesterday, 15 days ahead of target
laid off - when workers lose their job (because there is not enough; not their fault, workers did nothing wrong themselves)
staff - workers,金網, employees พนักงาน
30 factories there have already laid off over 8,700 staff.
projected - expected, forecast; the amount that experts believe for the future
estate - same as "industrial estate"
the 20-year-old estate projected it would reopen on Dec 15
inundated - flooded ถูกน้ำท่วม, จมลงใต้น้ำ
five estates in the province are inundated: Hi-Tech, Factoryland, Bangpa-in, Rojana, and Saha Rattana Nakorn
employed at - have a job at
investment - taking your money and putting it into projects to make a profit or earn interest (buying stock shares, bonds, real estate)
There are 60,000 workers employed at Hi-Tech with direct investment of 60 billion baht.
official - a high level staff member at a government agency
Wannarat Srisuksai, Ayutthaya's Labour Protection and Welfare official
headcount - the number of employees or workers that a company has working for it
cutting headcount - reducing the number of workers
the number of factories cutting headcounts has more than doubled from 12 last month to 30.
slated for - planned for (will do in the future)
330 million slated for building 11 kilometres of a new dyke around the estate with a height of 5.40 metres.
above sea level - the standard way of measuring how high a place, measuring the "elevation" of a place (See Wikipedia)
existing dyke - the dyke they have now
peak - highest level; the time when something is at its highest or greatest level ช่วงเวลาที่พบมากที่สุด
the existing dyke is 4.20 metres high, but the flood reached 4.9 metres above sea level at its peak
hike - same as "utility hike" = increase in "utility fees"
the hike is aimed at mobilising money to repay loans for building the dyke.
approval - official permission; saying "yes" you can do something, getting official permission to do something การอนุมัต
subject to approval - will happen only after "official permission" and "approval" has been given
apply - use
will be applied for 15 years - will be used for 15 years
the increased fee, which is subject to approval from IEAT, will be applied for 15 years
infrastructure - the high-cost facilities that everyone in the economy shares (water, roads, electricity, trains) สาธารณูปโภค
submerged - under water จมน้ำ อยู่ใต้น้ำ
submerged estates in Ayutthaya
expected - believe will happen คาดว่า (จะเกิดขึ้น)
relocate - move to another location ย้ายไปตั้งอีกที่หนึ่ง
leverage - 1. a small force producing great results (See glossary); 3. using borrowed money to buy assets (higher leverage = higher percentage of borrowed money used in purchase)
relocate to leverage risks - place business operations in many locations to reduce risk of disruptions
3% of the existing 140 companies are expected to relocate from Hi-Tech partly to leverage risks.
Some companies heavily relied on manufacturing in Thailand
disruption - prevented from operating normally; a situation in which something cannot continue because of a problem การขัดขวาง, การหยุดชะงัก
looking at - considering, thinking about, evaluating before making a decision
minimise - to reduce something harmful or unpleasant to the smallest amount or degree ลดจำนวนลง ลดให้เหลือน้อยที่สุด
risk - danger
minimise risks of disruption - make it very unlikely in the future that business operations cannot continue because of a problem
looking at other locations to minimise risks of a disruption in the future
Photo above of cleaners reporting for duty at the Canon factory at the Hitech Industrial Estate (Photo: Thiti Wannamontha)
Click button to listen to Industrial Estates Reopen to download
Originally designed for use on beaches and marshes for erosion and flood control, the Hesco Bastion quickly became a popular security device in the 1990s.
2011-09-05
t post-Rock Face
Rock Face,t post
Information
|
2011-08-29
ワイヤーメッシュ-GUANTANAMO BAY
GUANTANAMO BAY,ワイヤーメッシュ, Cuba (Dec. 31,t post-GUANTANAMO BAY,Stone Cage,ワイヤーメッシュ-GUANTANAMO BAY, 2009) A Soldier stands guard in a tower at Camp Delta at Joint Task Force (JTF) Guantanamo Bay. (U.S. Army photo by Spc. Cody Black/Released)
古巴关塔那摩湾(2009年12月31日)- 特遣部队德尔塔营的塔楼