2011-12-24

Flood prevention the easy way-metal wire mesh

Military Barrier
Military Bastion
Military Barrier
Military Bastions
Military Barriers
Hesco Bastion
Hesco Barrier
Military Barriers/Hesco Bastions
Military Barriers/Hesco Bastions
Military Barriers/Hesco Bastions

Flood prevention the easy way,Tie Wire

Published: 1/12/2011 at 11:09 AM
Online news: Easier Stuff




A group of Thai technical experts are suggesting a relatively quick and painless way to prevent major floods in the future: a long tunnel.


Please join us on our facebook page: http://www.facebook.com/bangkokpostlearning




Click button to listen to Flood tunnel and rightclick to download

Flood prevention the easy way


Water flows from high areas to low. In the case of a major flood,浪型网, this process can be slow and massively destructive or,cattle fence, according a group of Thai technical experts, it can be quick and relatively painless.



The Thailand Underground and Tunnelling Group has suggested the government invest around 200 billion baht to build a 100km-long tunnel under the eastern section of the outer ring road to prevent future flooding in and around the capital.



Suchatvee Suwansawat, TUTG chairman, yesterday said the proposed tunnel should be built from Bang Pa-in in Ayutthaya to Samut Prakan province where the water would empty into the Gulf of Thailand. It could be completed in two years.



The tunnel would be designed as a double-deck underground structure, called a multi-service flood tunnel system, and would also be equipped with hydropower generators for power production,black wire mesh, Assoc Prof Suchatvee said.



The upper deck would be used as a road under normal conditions when there were no floods or during minor and moderate flooding.



The lower deck would be used as a flood drain during normal situations.



During major floods,gabions, the upper deck would be closed to traffic and turned into a floodway to help speed up drainage of run-off.



Assoc Prof Suchatvee said a similar system should also be considered for the western part of Bangkok.



Large tunnels would be practical, more effective and thus the best solution to prevent major flooding over the long run.



Prasong Tarachai, former president of the Engineering Institute of Thailand said the underground flood prevention tunnel system should be built from Nakhon Sawan.



He also suggested integrating 20 state agencies involved in the water management system and creating a more accurate water information system.



"City planning should be revised to include floodways," he said.



Adapted from a story in todays Bangkok Post by Kanana Katharangsiporn.



prevention preventing something bad from happening การป้องกันภ้ย

flow (of a liquid) to move continuously in one direction ไหล

process a series of things that happen,Govt urged to build B200bn flood tunnel-Expanded Mesh Machine, especially ones that result in natural changes ขบวนการ,Concerns, floodwaters rise in Bangkok-Expanded Metal Mesh, ,การเปลี่ยนแปลง

massive very large ใหญ่มหาศาล

destructive causing great damage or harm ซึ่งเป็นการทำลาย

expert someone who has a particular skill or who knows a lot about a particular subject ผู้เชี่ยวชาญ

relatively somewhat; in comparison with someone or something similar ค่อนข้าง

tunnel an underground passage อุโมงค์

section any of the parts into which something is divided ส่วน, ส่วนที่ตัดออก,wire, ส่วนย่อย

ring road a road that goes around a large town or city,Eastern area dry next week-不锈钢生丝,镀铜网, for keeping traffic away from the town centre ถนนวงแหวนรอบนอก

capital the most important town or city of a country, usually where the central government operates from เมืองหลวง

proposed suggested as an idea for a group to consider ถูกเสนอ

empty to flow or move out from one place to another ปล่อยน้ำทิ้ง

double-deck having two levels, one on top of the other สองชั้น

multi- more than one; many มาก, หลาย

hydropower power generated by running water

generator a machine that produces electricity เครื่องกำเนิดไฟฟ้า

normal typical, usual or ordinary; what you would expect ภาวะปกติ

conditions the circumstances or situation in which people live,石笼网,Bangkok flooding passes critical point PM-Wire Mesh Fence, work or do things เหตุการณ์,石筐, สภาพการ, สถานการณ์

minor not important; small; having little influence or effect เล็กน้อย

moderate neither very great nor very small in strength, size,Gabion Gravity Retaining Walls, amount or degree ระดับปานกลาง

drain to cause water or fluid to flow out ระบายออก

situation all the circumstances and things that are happening at a particular time and in a particular place สถานการณ์

consider to give careful thought to something before making a decision พิจารณา

practical - suitable for the situation in which something is used ที่ขึ้นอยู่กับความเป็นจริง

effective producing the result that was intended ได้ผลดี

solution a way of solving a problem or dealing with a difficult situation วิธีแก้ปัญหา

the long run over a long period or time, rather than a short period ในระยะยาว

integrate to combine things of different types in one effective system รวมเข้าด้วยกัน

state government รัฐบาล

accurate correct, exact and without any mistakes ถูกต้อง,Thailand's Thongchai in floods appeal-hesco bastion, แม่นยำ

revise to change, improve, or make additions to something แก้ไข




Military Barriers/Hesco Bastions

Information


The QIAOSHI's Military Barriers or Hesco Bastions is a modern gabion used for flood control and military fortification. It is made of a collapsible wire mesh container and heavy duty fabric liner, and used as a temporary to semi-permanent dike or barrier against blast or small-arms. One of the less heralded life- and labor-saving devices of war, it is used on nearly every United States Military base in Iraq as well as on NATO bases in Afghanistan.


Originally designed for use on beaches and marshes for erosion and flood control, the Hesco Bastion quickly became a popular security device in the 1990s.

Assembly
Assembling the Hesco Bastion entails unfolding it and (if available) using a front end loader to fill it with sand, dirt or gravel. The placement of the barrier is generally very similar to the placement of a sandbag barrier or earth berm except that room must generally be allowed for the equipment used to fill the barrier. The main advantage of Military Barrier, strongly contributing to their popularity with troops and flood fighters,Expanded Metal Meshes, is the quick and easy setup. Previously, people had to fill sandbags,sheep fence, a slow undertaking, with one worker filling about 20 sandbags per hour. Workers using Military Barrier and a front end loader can do ten times the work of those using sandbags.
The Hesco Barrier come in a variety of sizes. Most of the barriers can also be stacked, and they are shipped collapsed in compact sets. Example dimensions of typical configurations are 46" x 36" x 32 (1.4m x 1.1m x 9.8m) to 7 x 5 x 100 (2.1m x 1.5m x 30m).
A new system of Hesco Bastion developed specially for military use is deployed from a container, which is dragged along the line of ground where the barrier is to be formed, unfolding up to several hundred meters of barrier in minutes, ready for filling with soil by a backhoe.

Protection
Filled with sand, 60 centimetres (24 inches) of barrier thickness will stop rifle bullets and shell fragments. It takes 1.5 metres (five feet) of thickness to prevent penetration by a rocket propelled grenade round. Approximately 1.2 metres (four feet) of thickness provides protection against most car bombs.










Specification

No comments:

Post a Comment

Note: Only a member of this blog may post a comment.